Meridex provides project management and controls services for construction and infrastructure projects — cost control, planning, and reporting, handled end to end. We also sell the templates and courses we use ourselves.
Focused controls support for contractors, developers, and public bodies — brought in for a single package or the full programme.
Budgets, cost reporting, change control, and forecasting kept current and defensible from tender through to final account.
Baseline programmes, progress tracking, and delay analysis, built to hold up under scrutiny and drive real decisions on site.
Live risk registers and change-order control that catch cost and time impact early, not at the final account.
Day-to-day coordination across design team, contractor, and client — one point of accountability for programme and budget.
A sample of the kind of work we do. Replace these with your own project write-ups once you have client sign-off to publish them.
Programme had slipped six weeks by the time we were brought in. Rebuilt the baseline and resequenced trades to recover the schedule.
Cost reporting had fallen out of date, hiding early scope creep. Rebuilt reporting to flag variances monthly instead of at final account.
Frequent change-order disputes were stalling payment. Introduced a live risk and change register tied to the programme.
Self-paced courses built from real project experience. Enrol once and keep access.
How to set up a cost report that catches problems before they hit the final account.
Constructing a schedule baseline that survives scrutiny from the client and the contractor alike.
Keeping a risk register alive past month one, and reporting it in a way people actually read.
Course delivery placeholder — connect these "Enrol" buttons to a course platform (Teachable, Podia, Thinkific) that handles payment, video hosting, and access for you.
The exact spreadsheets and trackers we use on our own projects. Pay once, download instantly.
Budget vs actual, forecast to complete, and variance commentary, ready to drop your figures into.
Track planned vs actual progress by activity, with automatic variance flags.
Pre-built scoring matrix, mitigation owner tracking, and a monthly review layout.
Log, cost, and status tracker for every change order on a project, in one place.
Important: a plain HTML page cannot securely take payment or hide a file behind a paywall by itself — anyone can view the file link in the page source. Connect these "Buy & download" buttons to a product page on Gumroad, Lemon Squeezy, or Stripe Payment Links instead; they take the payment and deliver the file securely, with no extra backend needed from you.
Short, practical notes from the field.
If a variance shows up for the first time at month-end, the report failed weeks earlier. Here's how to catch it sooner.
Slippage rarely appears all at once. These are the small signals to watch for on a weekly progress call.
Most risk registers are built once and never opened again. A simple review habit fixes that.
Every engagement starts by agreeing the cost and schedule baseline everything else will be measured against.
No dashboards for their own sake — reporting is built around the decisions the client actually needs to make.
Regular site presence, so controls data reflects what's actually happening, not what was planned three months ago.
Tell us about your project and we'll come back to you within one working day.